Rates
How we price analysis work
Quotes depend on fleet size, number of depots, and whether records need transcription. The figures below are starting points for planning — not checkout prices.
| Engagement | Starting basis | What moves the quote |
|---|---|---|
| Fleet Performance Review | From 18,000,000 VND per engagement | Vehicle count, weeks of history, and on-site days |
| Route Efficiency Study | From 12,000,000 VND per corridor | Corridor length, reporting cadence, or observation days |
| Delivery Exception Reporting | From 6,500,000 VND per reporting cycle | Corridor length, reporting cadence, or observation days |
| Depot Turnaround Audit | From 9,500,000 VND per depot | Corridor length, reporting cadence, or observation days |
Estimate factors we always ask about
- Number of active vehicles and subcontractors in scope
- Whether GPS traces exist or paper logs need digitizing
- How many shipper exception codes must appear in the appendix
- Whether the briefing happens on site in Thai Binh or remotely
Deposits
Flagship reviews typically require a 40% deposit to reserve analyst time, with the balance due on delivery of the final dossier. Recurring exception report packs are invoiced per cycle.